410 Tamworth - Ottor AI

410 Tamworth <> Revisit for Onboarding

Transcript

The meeting focused on the cleanup and maintenance of a property, highlighting several issues. Key points included the need for resurfacing the tub, kitchen sink, and backsplash, and sealing the tile due to mildew. The team discussed the importance of securing the Make ready job, which could equate to six months of management fees. They also addressed the installation of a CO detector in the hallway and the removal of a non-functional heater. Additionally, they noted the need for correct plumbing lines, fixing broken tiles, and ensuring proper paint jobs. The conversation concluded with scheduling follow-up tasks and addressing minor issues.

Action Items

  • [ ] Seal the tile in the bathroom that needs attention.
  • [ ] Determine if the refrigerator should be included as an optional item.
  • [ ] Schedule the next steps and follow up on the outstanding items.
  • [ ] Take down the CO detector heater in the hallway and cap it.
  • [ ] Provide the punch list to the contractor, Phil, without any numbers on it.
  • [ ] Take pictures of the issues with the tile, trim, and paint.

Outline

Cleanup and Initial Observations

  • Unknown Speaker notes a recent cleanup, with Speaker 1 and Speaker 2 agreeing on the significant improvement.
  • Speaker 5 comments on the old-school bathrooms being disgusting, and Speaker 1 mentions the need for resurfacing.
  • Discussion about the size of sinks and the process of fine-tuning the process with vendors.
  • Speaker 1 explains the importance of securing the Make ready job and the potential management fees involved.

CO Detector and Heater Issues

  • Unknown Speaker mentions the lack of a CO detector in the hallway.
  • Speaker 5 suggests removing a non-functional heater and capping it, as it is not needed with the existing exhaust.
  • Speaker 2 agrees with the suggestion to cap the heater.
  • Speaker 1 points out the need for attention on the tile, which is described as a terrible design choice.

Tile and Sealing Needs

  • Speaker 1 discusses the need to seal the tile and mentions bringing it up to the owner.
  • Unknown Speaker confirms that Phil has a resurfacing vendor lined up for next Monday and Tuesday.
  • Speaker 1 and Unknown Speaker discuss the correct lines for the plumbing, with Speaker 5 explaining the difference between 48 and 62-inch lines.
  • Speaker 5 suggests fixing the plumbing issue by cutting the middle section and taking pictures for documentation.

Painting and Touch-Up Issues

  • Speaker 5 points out the wrong touch-up color used in the paint, which appears shiny from certain angles.
  • Speaker 4 asks if they are creating a punch list for Phil, and Speaker 5 suggests giving Phil a quote without numbers.
  • Speaker 1 explains the process of helping the owner by providing a list of items and accompanying photos.
  • Discussion about the need to avoid the owner double-painting and the importance of skilled representation.

Door and Tree Issues

  • Speaker 5 notes that the door is not painted and that the colors are slightly different.
  • Unknown Speaker mentions the pencil marks and screws on the door, indicating it was placed last.
  • Speaker 5 discusses the need to cut down a tree that was planted by China.
  • Speaker 5 describes the yard cleanup done by Phil, including removing a back fence and cutting down trees.

Water and Plumbing Issues

  • Speaker 5 mentions a leaking water hose and the need for a cover for the hot water line.
  • Speaker 5 discusses the need to make cabinet doors close and the issue with the dryer vent.
  • Speaker 1 suggests including an optional refrigerator in the unit, explaining the challenges with the current size.
  • Speaker 5 and Unknown The speaker discusses the need to refinish the Vex flare and the condition of the paint job.

Scheduling and Final Remarks

  • Speaker 1 mentions working on Friday afternoon and having an appointment on Tuesday.
  • Speaker 5 notes that Craig has another punch list of tiny items that need to be done.
  • Unknown Speaker confirms the appointment on Tuesday and the need to complete the tasks.
  • The meeting concludes with a focus on finalizing the punch list and ensuring all issues are addressed.